A measured  and sustainable approach to financing the project

AURORA will invest in buildings and lease to an operating company (OpCo). The plan assumes that AURORA will be able to finance further build-up following Phase 1 with limited additional equity injection. Almost all financing in Phase 2 and 3 will then be raised from the operation and by adding debt.

The capital structure in Phase 1 (D/E = 60/40) is expected to support the build up and showcase how the operation will become profitable and able to finance the construction in Phase 2 and Phase 3.

Development into Phases 2 and 3 will be less costly as the land has been acquired in full in Phase 1 and supporting space such as for offices, mill and props&equipment will not have to be increased proportionally.

THE COST

_MG_2351.jpeg

Total cost of Phase 1 is $79 million - considerably less per square meter than comparable studio development projects in Europe and North America.

In the base plan the project is divided into three phases. The construction time for the first phase is estimated 18 months.

The second phase could start as the first phase is up and running. This will enable the construction cost to be financed with limited equity injection.

The Phase 1 capital structure is planned to be approximately 60/40 debt to equity. As the studios are up and running, generating income, we plan the debt to equity ratio closer to 70/30 financing in Phase 2 and Phase 3.

SIG06320.jpeg

Breakdown of SQFT, buildings
Sound stages
Offices and service building
Mill
Props and Equipment

Total

 Accumulated size in SQFT
  43.056            86.112            150.696
  32.292 
          43.056              86.112
  16.146            26.910              26.910
  32.292            32.292              64.584
123.7
86          188.370            328.302
 

USD/SQFT

$516

$275

$344

$344

 Total SQFT               328.302
           820.755
           137.026
  USD/IS
K=135

Land utilization:
SQFT built
Estimated land use

Land for further development
 

SQFT pr. phase
123.786             64.584            139.932
309.465           161.460            349.830
648.316           486.856            137.026

 

 

AURORA'S ACTUAL SITE

AURORAstudios-website_12nov2023 copy copy_edited.jpg

PHASE 1

m

2

SQFT

Sound stage 1

Sound stage 2

Production support

Mill / Equipment / Props

Total

2.000

2.000

3.000

4.500

11.500

21.528

21.528

32.292

48.440

123.788